Problems we solve · Roof · Central plant
Chillers and plant near end of life
“Our chillers are near end of life. Do we replace them now, or keep nursing them along?”
Replacing plant like-for-like often means paying for capacity the building no longer needs. We assess remaining life and the real loads, so new plant is sized to the building you have today and timed to your capex plan, with funding options if the budget isn’t there.
01Why it happens
The usual causes.
- Like-for-like replacementPlant sized for the original building is often far bigger than today’s loads need.
- Phased-out refrigerantsOlder equipment on refrigerants like R22 is costly to keep running and repair.
- No capex allocatedThe replacement is needed now, but the budget is planned for later.
- Risk of failureEvery extra season of nursing old plant raises the risk of an unplanned outage.
02How we fix it
Four steps, one owner.
- 01Assess condition and lifeReview the condition and remaining life of HVAC and building services equipment.
- 02Measure the real loadSize new plant to the building as it runs today, not as it was designed.
- 03Plan the capexPrioritise and time replacements against condition, performance and financial return.
- 04Deliver and fundDeliver the upgrade, with Efficiency as a Service funding where the budget isn’t there.
What changes
Right-sized plant, replaced at the right time. At a 600-room Sydney hotel, 100% of the capex was funded through EaaS.
03Proof from our projects
Measured, not modelled.

600-room Sydney CBD hotel
Sydney CBD

Charles Sturt University, EPC Stage 2
Bathurst, NSW

Coles
National, 500+ stores
04Other problems we solve
Sound familiar?
Hot and cold complaints on tenant floors
Level 7 calls every afternoon. It’s too hot again.Read more Level 4 · Tenant fitout
Tenant fitouts that work with the base building
A new fitout is under way. Will it work with our base building?Read more Building-wide · BMS alarms
BMS alarms nobody acts on
Our BMS throws hundreds of alarms. Nobody looks at them any more.Read more