Problems we solve · Level 4 · Tenant fitout

Tenant fitouts that work with the base building

“A new fitout is under way. Will it work with our base building?”

A fitout designed without the base building in mind causes comfort problems, clashes with services and lost NABERS points for years. We review the design before it is built and support it through construction, commissioning and make-good.

01Why it happens

The usual causes.

  • Designers without the full pictureTenant designers rarely know the capacity and limits of the base building systems.
  • Clashes with base building servicesDuctwork, risers and ceiling services collide, and fixes on site cost time and money.
  • Extra loads addedSupplementary cooling and new equipment add load the central plant was not sized for.
  • Make-good disputesWithout a clear record, it is hard to agree what must be returned at lease end.

02How we fix it

Four steps, one owner.

  1. 01Set the rulesWrite fitout guidelines that tell tenants what the base building can support.
  2. 02Review the designCheck the tenant design and its interface with base building systems before work starts.
  3. 03Support constructionAnswer technical questions on site and witness commissioning of the new works.
  4. 04Plan for make-goodRecord the condition and agree make-good requirements before they become disputes.

What changes

The fitout connects to the building properly, and the tenant moves in to a floor that works.