
Case study · Health
Energy advisory for a 486-bed hospital running 24/7
879MWh
Electricity saved a year
878,608 kWh
576t
CO₂ emissions avoided a year
464h
HVAC run-time removed per week
Overview
At Northern Beaches Hospital, a 486-bed facility in Frenchs Forest, NSW that runs 24/7, Conservia’s energy advisory work saves 879 MWh of electricity and avoids 576 t of CO₂ a year, and has removed 464 hours of HVAC run time a week.
Northern Beaches Hospital is a 486-bed healthcare facility operating 24/7 and delivering critical public and private health services. Conservia was engaged as an Energy Advisory Partner to improve energy performance across the complex facility while ensuring that clinical environments, patient comfort, and operational reliability remained uncompromised.
Scope and responsibility
Hospitals are among the most energy-intensive building types due to strict ventilation requirements, sterilisation processes, surgical room pressure controls, and continuous operation. Northern Beaches Hospital required a coordinated energy management strategy capable of reducing energy consumption and emissions while maintaining strict operational and clinical performance standards.
HVAC strategy optimisation
Conservia worked with Alerton Australia and Ventia on an energy management approach that combined automated BMS optimisation with hands-on engineering oversight. The engagement included HVAC strategy optimisation, detailed scheduling reviews, and active management of the cogeneration plant to support heating hot water loads.
Energy savings results
Through targeted optimisation and improved operational oversight, the hospital achieved substantial reductions in energy consumption and plant operating hours. Detailed mapping of HVAC schedules against real department usage uncovered significant inefficiencies, allowing run-times to be reduced without affecting clinical operations. Early optimisation trials alone removed hundreds of unnecessary operating hours each week.
Impact
The project demonstrates how proactive energy management can deliver meaningful efficiency improvements in complex healthcare environments. By combining automation with hands-on engineering expertise, the hospital has reduced energy waste, lowered emissions, and extended equipment life while maintaining the strict environmental conditions required for patient care.
More health results
Similar buildings, measured results.

A large NSW club
NSW

Top Ryde City Shopping Centre
Ryde, NSW

Waverley Council
Waverley, NSW
Optimising Building Performance at Waverley Library