Charles Sturt University – Energy Performance Contract (EPC Stage 2)

/year - Cost savings

$ 0

kWh - Electricity savings

0

GJ/year - Natural gas savings

0

tonnes CO2-e/year - GHG reduction

0

// Solutions

Overview

Following the success of EPC Stage 1, CSU partnered with Conservia once again for the second phase of energy upgrades at Truskett Library in the Bathurst Campus. EPC Stage 2 targeted central plant infrastructure and mechanical system enhancements.

// Challenge

Solution

Conservia focused on replacing aged, inefficient systems with high-efficiency, low-emissions alternatives while continuing the rollout of intelligent control and lighting systems.

// Solutions

Key Measures:

// Challenge

Results

The project delivered strong performance across energy, financial, and environmental metrics. Annual savings included 813,548 kWh of electricity, 4,106 GJ of natural gas, and 740 kL of water, with natural gas savings exceeding the guarantee by 93%. Financially, the $1.1M investment generated $176,831/year in cost savings, outperforming the guaranteed $157,108/year by 12.6% ($19,723), with a 7-year payback period. Environmentally, it achieved a significant reduction of 1,077 tonnes CO₂-e/year in greenhouse gas emissions.

Energy and Gas Savings:

ResourceProposed
Savings
Achieved
Savings
% Over Target
Electricity111,570 kWh/year183,300 kWh/year64%
Natural Gas461 GJ/year480 GJ/year4%

Financial Outcome:

MetricValue
Project Cost~$132,860
Guaranteed Cost Savings~$18,480/year
Achieved Cost Savings~$26,554/year
Savings Over Guarantee$8,074 (43%)
Simple Payback Period7.2 years

Environmental Outcome:

MetricProposedAchieved% Over Target
GHG Savings148 tonnes
CO2-e/year
211 tonnes
CO2-e/year
43% over

// Challenge

highlights

More projects

Rising energy costs and increased regulatory pressures regarding environmental compliance posed challenges for ICC Group’s facilities.