Case study · Office

6-star NABERS Energy at 1 Denison Street with no capital expenditure

Client1 Denison Street

LocationNorth Sydney, NSW

SectorOffice

6★

NABERS Energy, up from 5

51%

Less base building electricity

73%

Less gas

$330k

Saved in electricity costs a year

The building

1 Denison Street is a 60,000 m² premium-grade office tower in North Sydney. Its tenants include Nine, SAP and Microsoft.

The building was designed for a 5-star NABERS Energy rating and reached it 12 months after construction. Within the first 18 months of Conservia’s engagement it earned its first 6-star NABERS Energy rating, and it has held 6 stars since.

The challenge

The owner wanted 6 stars without spending capital, and without making the building less comfortable for tenants. Demand on the building rose over the same period: occupancy went from 68% to 100%, and operating hours went from 56 to 64 a week, an increase of 14%.

What we changed

We ran a Building Optimisation Advisory programme focused on how the existing HVAC plant is controlled:

  • Economy cycle on the AHUs, to use outside air when it saves energy
  • Temperature and pressure resets on the AHUs
  • Return air fans moved from a fixed setpoint to a variable pressure setpoint
  • Chilled water plant temperature and pressure settings adjusted
  • Staged boiler temperature and pressure adjustments on the heating hot water plant
  • Plant operation that responds to the weather

These changes stopped the building heating and cooling at the same time, cut wasted energy and improved comfort.

Ongoing management

We continue to manage the building’s energy performance against its sustainability goals:

  • Continuous energy tracking and reporting
  • A 24-hour response to energy-related issues
  • Monthly performance reviews with the building team

The result

Base building electricity use is down 51% and gas use is down 73%, with $330,000 a year saved in electricity costs. The NABERS Energy rating went up a full star, from 5 to 6, while the building filled up and ran longer hours. None of it needed capital expenditure.

Next step

Talk about your building

Tell us what is happening in your building or portfolio. One of our engineers will be in touch.