Enhancing NABERS Performance in an Aging Commercial Office Tower

NABERS energy rating

0 Stars

Reduction in energy use

~ 0 %

Payback period

< 0 years
3560

// Introduction

Introduction

This aging commercial office tower is a high-rise asset located within a major metropolitan business district.

Recognising the evolving demands of the modern market and driven by a commitment to excellence, building management sought to proactively strengthen the asset’s sustainability credentials and operational performance to enhance its strong tenant offering.

// Challenge

Challenge

Building management sought to achieve a significant improvement in the NABERS energy rating. The brief focused on delivering efficiency improvements while minimising capital spend, avoiding disruption to tenants, and reducing performance risk through reliable, outcome-driven solutions.

2955112
9150

// Core Services Provided

Core Services Provided

Conservia delivered a performance-driven optimisation program under a guaranteed EPC, focusing on:

HVAC & BMS Tuning: Advanced control strategies to improve system efficiency and responsiveness.
Plant Optimisation: Targeted chiller and cooling tower tuning to maximise mechanical performance.
Enhanced Metering: Additional metering to accurately capture NABERS performance data.
Rigorous Verification: Continuous measurement to ensure all upgrades deliver
intended results.

// Key Solutions

Key Solutions

The project implemented targeted operational improvements to optimize building performance and energy efficiency, including:

  • Optimised HVAC control strategies to reduce energy use
  • Improved system performance through targeted plant tuning
  • Increased NABERS accuracy via refined metering approach
  • Delivered a 5 Star NABERS-aligned performance outcome
  • Implemented within a live building with no disruption
2386
72

// Conslusions

Conclusion

By prioritising operational optimisation and performance guarantees, building management achieved a strong uplift in energy performance within a single NABERS cycle. Through visionary management and targeted optimisation, it has
strengthened its position as a leader in the office market, demonstrating that sustainability and financial performance align.

// Testimonial

Testimonial

“This project shows how smart optimisation can cut operating costs, reduce performance risk, and deliver outcomes backed by clear financial guarantees.”

– Conservia Project Statement

1698

More projects

Rising energy costs and increased regulatory pressures regarding environmental compliance posed challenges for ICC Group’s facilities.

25 Franklin Street

Charles Sturt University

Charles Sturt University (EPC Stage 2)

Creating Smiles Through Excellence